Mold making and injection molding in Dongguan, China

Injection molding machines in rows on the Taiyuan plant floor in Dongguan

Mold making · Injection molding · Automation

Precision molds and molded housings for power and connectivity products

We design and build the tool, then mold, automate and inspect the housing in one plant in Dongguan, Guangdong: 71 machines, 25 to 35 new molds a month, ISO 9001 and ISO 14001.

  • 71 Injection molding machines across two plant areas
  • 25–35 New molds built per month
  • 150+ Employees, including 20 mold makers
  • 4,000 m² Plant area, 3,000 m² of production floor
Wide view of the injection molding workshop with overhead material lines
In-house Tool shop, molding floor and automation department

One plant, one owner for the tool and the part

Mold design, toolmaking, molding and automation are not outsourced

Your project starts at DFM and ends with packed parts. Because the tool shop, the molding floor and the automation team sit in the same building, a mold change, a gate adjustment or a new insert machine is measured in hours rather than weeks.

  • Mold design and review before steel is cut
  • CNC, EDM, wire EDM, milling, grinding and drilling on site
  • 71 molding machines from 80T to 260T across two plant areas
  • Five-axis servo take-out, automatic sprue cutting and pin insertion
See the capabilities

Engineering

The three problems that decide a power housing

Straight walls, fine texture and invisible parting lines are where most housing projects stall. These are the methods our engineering team has already production-proven.

Read the engineering notes
01

Zero-draft, slide-free molding

Straight-wall charger housings molded without slides: 163 mm tall, VDI 30 texture, no drag marks on the side walls.

02

Edge stress-mark control

Cavity-core pull and a mother-cavity ejection layout remove the thick-to-thin flow mark that shows as a bright edge on PC housings.

03

Slide parting-line control

Two- and four-side slide tools with calculated thermal growth of slide and cavity, so batch after batch the parting line stays below hand-feel.

How a project runs

From drawing to packed cartons

A fixed sequence, with documented checks between each step.

  1. 01

    Quotation & DFM

    We review the 3D model, wall thickness, gate position and texture, then quote tooling and part price.

  2. 02

    Mold design

    Cavity layout, cooling, ejection and slide design are agreed before machining starts.

  3. 03

    Tool build & trial

    Machining, fitting and T0 trial. First articles are measured and sent for approval.

  4. 04

    Mass production

    Molding, in-line inspection and automatic secondary operations run to the approved parameters.

  5. 05

    Inspection & packing

    Final inspection, RoHS documentation where required, packing and shipment.

Quality & laboratory

Materials and parts are checked in our own laboratory

Incoming resin, in-process parts and outgoing shipments are inspected by a 15-person quality team, using RoHS screening, salt spray, melt flow index, color and gloss measurement, drop and ball-impact tests, and a high-low temperature chamber.

  • ISO 9001:2015 and ISO 14001:2015 certified management systems
  • IQC, IPQC, OQC gates with documented records
  • Parts produced to RoHS requirements
Quality control in detail
X-ray fluorescence spectrometer used for RoHS screening of incoming resin and partsHigh and low temperature test chamber in the quality laboratoryTwo-dimensional vision measuring machine with operator workstation

Certification

Management systems audited to ISO 9001 and ISO 14001

The quality and environmental management systems are certified by a third-party body. Certificates are available for download and can be sent with your quotation package.

View certificates

Engineering notes

What we have learned on the molding floor

All notes

Send us your drawing and get a tooling quotation

Tell us the part, the housing style, the annual volume and the market. We will reply with a feasibility note, tooling approach and lead time.